Pipefitter with background in job coordination and worksite setup. Knowledgeable in safety processes, regulations and pipe selection. Hard-working Fitter with [Number] years of experience installing. Team-oriented individual skilled in Isometric reading.
Fully worked at Power Plant CCGT projects L10, L11 and L12 at Lamma Island.
Assisted Siemens Company for commisioning of CCGT power plant D2 at Blackpoint, Tuen Mun for CLP.
Assembling, staying shift duty carried out for standby/maintenance and dismantling the 14 m TBM Machine. Succesfull breakthrough TBM team of HKLTH.
Successfully installing the the chiller towers, compressors, service pipes lines from the the surface to the TBM machine.
TBM Assembly/dismantling, Shift duty, standby/maintenance 9metre TBM Machine. Project 820 completed. Part of the starting team assemblying 17m and 14m TBM at TMCLK project.