· Main Contract Works for Proposed Redevelopment of the Mariners' Club at 11 Middle Road, Tsim Sha Tsui, Kowloon, Hong Kong (HKD 1.64B) (尖沙咀海員俱樂部重建項目)
Project Description:
Construction of G/F, 1/F to 2M/F of podium, 31 levels of guestroom floors, 6 levels of facilities and staff offices floors, 1 level of sky garden, 2 levels of refuge floors, roof & top roof & associated external & landscaping works. The construction floor area is approximately 45,900 m². The project aims to achieve BEAM Plus requirement for New Buildings Version 1.2 in “Gold” rating.
Duties:
- Management of planning, progress monitoring, sub-contractor’s performance and tackling with the site issue.
- Statutory submission and inspection scheduling.
- Quality control for workmanship.
- Decision making, manage and take lead for site staff.
Projects involved:
· 4 nos. of 33 levels with total 1222 units Luxury Service Apartment Development for Genting Highland (Phase 1 & 3) (MYR 165.5M & MYR 172.8M)
· Starbucks retail and associated external works at Rawang (MYR 2.5M)
· 2 units of Uniqlo retail store and office at Rawang (MYR 5.3M)
· Building works for Aplinia Residential Development comprising 5 levels of carpark, 2 nos. of 22 levels (512 units) service apartment. (MYR 96.3M)
· 7 Storey Low Density Residential Development of town house for CK East Development (MYR 63.5M)
· 2 Blocks of 35 Storey High Rise Residential Development at Kuala Lumpur (MYR 293.8M)
· 236 units of 3 storey town houses at Puchong Tekali (MYR 85.6M)
· 9 storey of office building plus 2 storeys basement carpark (MYR 37M)
· Substructure works for Dorsett Waterfront at Subang, Selangor (MYR 25.5M)
· Superstructure Main Contract (Podium) For The Proposed Residential Development at N.K.I.L. 6514 Kwun Tong Town Centre (Development Areas 2&3) (HKD1150M)
(觀塘市中心第二及第三區住宅發展項目平台工程)
Project Description:
Construction of 2 level basement and 6 level Podium deck including design and construction of pre-stress transfer plate with provision of starter bars for all four residential towers above. The development accommodate shopping arcade, Government Accommodation (i.e. Refuse Collection Point, Hawker Bazaar and Public Transportation Interchange for franchised buses and public light buses) carpark and clubhouse. The total construction floor area is approximately 78,000 M².
Duties:
- Management of planning, progress monitoring, sub-contractor’s performance and tackling with the site issue.
- Statutory submission and inspection scheduling.
- Quality control for workmanship.
- Decision making, manage and take lead for site staff.
· Main Contract for Sheung Shing Street Campus Development at Fat Kwong Street / Sheung Shing Street, Ho Man Tin, K.I.L. 11265, Kowloon, Hong Kong for The Open University of Hong Kong (HKD 579.7M)
(香港公開大學何文田校舍)
Project Description:
Construction of 1 level basement carpark and 12 stories Nursing and Healthcare Complex featuring with total of 700 seat-auditoria, nursing and healthcare laboratories, classrooms, student activities rooms, learning commons, sports facilities, office, conference center etc., completed with all related E&M and landscape works and additions & alterations works for the existing footbridge across Sheung Shing Street. The total construction floor area is approximately 25,000 M²
Duties:
- Management of cost control, progress monitoring, sub-contractor’s performance and tackling with the site issue.
- Statutory submission and inspection scheduling.
- Quality control for workmanship.
- Decision making, manage and take lead for site staff.
· The Proposal Residential Redevelopment at No. 7 Headland Road, RBL 685, Hong Kong (HKD221M)
(赫蘭道住宅發展項目工程)
Project Description:
Construction of 3-storeys high domestic block (a total of 4 units), a 1-storey high clubhouse with swimming pool, carpark and plant rooms including all Fixed Out and Landscaping Works. The GFA is approx. 2,180M².
Duties:
- Management of cost control, progress monitoring, sub-contractor’s performance and tackling with site issue.
- Statutory submission and inspection scheduling.
- Quality control for workmanship.
- Decision making, manage and take lead for site staff.
· Proposal Residential Redevelopment at Lot No. 379 at D.D. 224, 2 Serenity Path, Sai Kung, New Territories, Hong Kong (HKD102M)
(西貢安寧徑2號住宅工程)
Project Description:
The Works include construction of 3 nos. of 2 storeys detached houses including all associated E&M works & external works and fitting out works (including swimming pool, garden and other landscape facilities). The GFA is approx. 960M².
Duties:
- Planning, monitoring for site progress, ensure project qualities.
- Decision making, manage and take lead for site staff.
- Cost control.
- Manage construction contract.
· Lot No. 1588 Pik Sha Road, Sai Kung, Hong Kong (Agile Group Holding Ltd)
Project Description:
A residential houses project with site area of 7,615 sq.m. as a Main Contractor for 8 houses and 1 club house building including E&M works. Main responsible for the construction of substructure, superstructure, window wall, stone cladding, E&M service, hard & soft landscape etc.
· DAN 6, Hong Kong (HKR)
Project Description:
A industrial building project with site area of 547 sq.m. as a Main Contractor for 21 storeys industrial building including lift lobby fitting out and E&M works. Main responsible for superstructure, window wall and fitting out works.
· No. 1 Gough Hill Road, The Peak, Hong Kong
Project Description:
A residential houses project with construction area of 4,532 sq.m. as a Main Contractor for three residential houses including E&M works. Main responsible for the superstructure, curtain wall, stone cladding, hard & soft landscape, fitting out works etc.
· No. 11 Verbena Road, Kowloon Tong, Hong Kong
Project Description:
A residential houses project for construction of fitting out works. Main responsible for coordination among consultants, designer, clients and construction teams and monitor the quality and progress.
· Good Hope Kindergarten, Hong Kong (Good Hope)
Project Description:
A school, for construction of A&A works. Main responsible for renovation and fitting out works.
· Tak Oi Secondary School, Hong Kong (Tak Oi)
Project Description:
A school, for construction of A&A works. Main responsible for coordination works with client for the campus design and renovation.
· Good Hope School, Hong Kong (Good Hope)
Project Description:
A school project with construction area of 27,522 sq.m. as a Main Contractor for redevelopment of Good Hope School (Primary Section, Kindergarten, chapel and convent). Main responsible for coordination works with client for the design for the school campus. The scope including design, superstructure, swimming pool, classroom, carpark, chapel and convent.
· 10 Pollock’s Path, The Peak, Hong Kong (Royden Development Ltd)
Project Description:
A residential houses project as a Main Contractor for four residential houses including building services works. The scope including the superstructure, curtain wall, stone cladding, hard and soft landscape etc.
· 8A-8F Shiu Fai Terrace, Hong Kong (Chinese Estate Holding Ltd)
Project Description:
A residential houses project with construction area of 11,260 sq.m. as a Main Contractor for construction of a 14-storeys high residential blocks including carpark storey and a podium floor with club house facilities. Main responsible for the construction the superstructure, E&M works, curtain wall, fitting out works etc.
· HKUGA College, Hong Kong (ASD)
Project Description:
A new secondary school project with construction area of 15,640 sq.m. as a Main Contractor for construction of a 7-storey Secondary School building construction of two linked rectangular blocks with assembly hall including interior fitting out works and E&M works. Main responsible for coordination works among consultants and construction teams; quality control, programme and progress monitoring etc.
· Po Sang Bank Building, Hong Kong
Project Description:
A commercial building for construction of decoration works for main lift lobby including E&M works.
· Po Sang Bank Building, Hong Kong
Project Description:
A commercial building with construction area of 5,000 sq.m. for construction of renovation work of external wall.
Projects involved:
· Wong Chuk Hang 132 KV Substation, Hong Kong (HKE)
· The School of Public Health and Auditorium at Prince of Wales Hospital, Hong Kong (ASD)
· Kwun Tong Regional Deport, Hong Kong (WSD)
· Central Kowloon Child Assessment Centre and Skills Centre, Hong Kong (ASD)