Overview
Work History
Education
Key Data
Selected Projects
Current Position
Personal Information
Timeline
Generic
Rowan Kwong Yeung CHUI

Rowan Kwong Yeung CHUI

Project M&E Manager
Tai Po

Overview

17
17
years of professional experience
2009
2009
years of post-secondary education

Work History

Project M&E Manager

Gammon Construction Limited
01.2024 - Current
  • MTR Contract No. 1653 – Tunnel Environmental Control System for Kwu Tung Station (KTU) (East Rail Line (EAL)) (NEC Project)
  • MTR Contract No. 1253 – Trackside Auxiliaries and Tunnel Environmental Control System (NEC Project)
  • Contract Sum: ~HK$ 168M
  • Contract Sum: ~HK$ 342M
  • The scope of works comprises the design, manufacture, supply, delivery, installation, coordination, statutory submission, testing, commissioning, integration testing, activities and operations to be carried out during Test Running, maintenance services and rectification of defects during the period between Completion of the whole of the works and the defects date and all the works of the Tunnel Environmental Control System for the Kwu Tung Station at East Rail Line (KTU(EAL)).
  • Responsible for overall project management including: Monitoring of overall project status, Control and monitoring of the commercial position of the project, Setting strategy for securing to maintain the margin and turnover

Project M&E Manager

Gammon Construction Limited
01.2021 - 01.2024
  • Contract No. HY/2019/13 Central Kowloon Route – Buildings, Electrical and Mechanical Works (NEC Project)
  • Contract Sum: ~HK$ 5.67 Billion
  • The major items of the Works: Tunnel Cladding Works, Construction of tunnel buildings and facilities, E&M works, including: Tunnel Ventilation System (TVS), Air Purification System (APS), Tunnel and Approach Road Lighting, Central Control and Monitoring System (CCMS) and Extra Low Voltage (ELV) System, Electrical System for buildings, tunnel and approach roads, Building Services System for buildings, Traffic Control and Surveillance System (TCSS), Plumbing and Drainage System in tunnel and approach roads, Fire Services System in tunnel and approach roads.
  • Responsible for project planning and monitoring, design of tunnel E&M systems, project management, resources planning and statutory submissions.

Senior Engineer (M&E)

Gammon Construction Limited
08.2018 - 12.2020
  • TMCLK Link – Northern Connection Tunnel Building, Electrical and Mechanical Works
  • Contract Sum: ~HK$ 2.59 Billion
  • The scope of work includes the design, manufacture, supply, installation, T&C for Tunnel Ventilation, Tunnel and Road Lighting, CMCS, TCSS, Electrical, MVAC, FS and P&D for tunnel buildings.
  • Responsible for project planning and monitoring, technical submission and coordination for interfacing with civil contractors.

Senior Engineer (M&E)

Leighton Contractors (Asia) Limited
09.2016 - 08.2018
  • Tseung Kwan O – Lam Tin Tunnel Main Tunnel and Associated Works
  • Contract Sum: ~HK$ 780M
  • This project included the construction of E&M works for a dual two-lane highway, approximately 4.2km long (of which about 2.6km is in the form of tunnel) connecting Tseung Kwan O and Lam Tin and associated administration building / ventilation building.
  • Responsible for project planning, technical submission and coordination for interfacing with civil contractors.
  • MTR Shatin to Central Link Contract 1175 – Building Services for Kai Tak Station
  • Contract Sum: ~HK$ 158M
  • The scope of work for Contract 1175 includes the design, manufacture, supply, installation, T&C for building services installation in Kai Tak Station.
  • Responsible for MVAC installation works, including statutory submission, and testing and commissioning for MVAC system.
  • Central – Wan Chai Bypass and IEC Link
  • Contract Sum: ~HK$ 3.18 Billion
  • The scope of work includes the design, manufacture, supply, installation, T&C for Tunnel Ventilation, Tunnel and Road Lighting, CMCS, TCSS, Electrical, MVAC, FS and P&D for tunnel buildings.
  • Responsible for TVS T&C works, including preparation of statutory inspection, and testing and commissioning for TVS system.

Assistant BS Engineer

Gammon E&M LIMITED (formerly known as Balfour Beatty E&M Limited)
07.2009 - 08.2016
  • South Island Line (East) – Trackside Auxiliaries and Environmental Control System
  • Contract Sum: HK$ 145M
  • This scope of the works comprises the design, manufacture, supply, delivery, installation, coordination, T&C of the complete Trackside Auxiliaries and Tunnel Environmental Control System for the South Island Line (East).
  • Responsible for TECS technical submission, drawing submission and coordination for interfacing with other designated contractors.
  • MEP Main Contract for HMB Project Bridge at HSBC Main Building Hong Kong
  • Contract Sum: HK$ 182M
  • This project is to upgrade the Building MEP infrastructure in which consist of 6 major packages namely vertical power, power transformers, office A/C, water pipes, seawater pump and additional UPS.
  • Responsible for replacement works of MVAC pipework, including drawing and material submission, site supervision and procurement.
  • Proposed Commercial Redevelopment (The ONE) at KIL No. 6022 RP Nos. 1-19 Granville Road & 100 Nathan Road, Tsim Sha Tsui, Kowloon
  • Contract Sum: HK$ 112M
  • This is a 25-storey retail complex and located in Tsim Sha Tsui. Its occupied surroundings and limited construction site area required meticulous planning and sophisticated coordination.
  • Responsible for MVAC construction works, including statutory and technical submissions, site supervision, site coordination for interface with other sub-contractor and procurement.

Intern

Jardine Engineering Corporation
01.2009 - 07.2009
  • Contract No. DE/2007/07 UV Disinfection Works for Shatin Sewage Treatment Works and Tai Po Sewage Treatment Works.
  • This contract aims to construct and operate new sewage treatment facilities in order to increase the sewage treatment capacity catering for the residential developments in Shatin.
  • Responsible for construction works, including drawing and material submissions and site supervision.
  • Assist in corporation internal audit according to ISO 9001, 14001 and OHSAS 18001 requirements.
  • Tendering for Environmental Protection Department project Sewage Interception Scheme in Kowloon City Sewage Pumping Stations.

Education

Bachelor Degree - Mechanical Engineering

Key Data

  • Experienced in project planning and programming
  • Building Services and Tunnel Ventilation System Design, Installation and Testing and Commissioning
  • Co-ordination with Client and Contractor to achieve the design and statutory requirement
  • Experienced in co-coordination with client and end-user to ensure smooth project delivery

Selected Projects

  • Gammon Construction Limited, Project M&E Manager, MTR Contract No. 1653 – Tunnel Environmental Control System for Kwu Tung Station (KTU) (East Rail Line (EAL)), 01/01/24, Present, HK$ 168M, MTR Contract No. 1253 – Trackside Auxiliaries and Tunnel Environmental Control System, HK$ 342M
  • Gammon Construction Limited, Project M&E Manager, Contract No. HY/2019/13 Central Kowloon Route – Buildings, Electrical and Mechanical Works, 01/01/21, 01/01/24, HK$ 5.67 Billion
  • Leighton Contractors (Asia) Limited, Senior Engineer (M&E), TMCLK Link – Northern Connection Tunnel Building, Electrical and Mechanical Works, 08/01/18, 12/01/20, HK$ 2.59 Billion, Tseung Kwan O – Lam Tin Tunnel Main Tunnel and Associated Works, HK$ 780M, MTR Shatin to Central Link Contract 1175 – Building Services for Kai Tak Station, HK$ 158M, Central – Wan Chai Bypass and IEC Link, HK$ 3.18 Billion
  • Gammon E&M LIMITED (formerly known as Balfour Beatty E&M Limited), Assistant BS Engineer, South Island Line (East) – Trackside Auxiliaries and Environmental Control System, HK$ 145M, MEP Main Contract for HMB Project Bridge at HSBC Main Building Hong Kong, HK$ 182M, Proposed Commercial Redevelopment (The ONE) at KIL No. 6022 RP Nos. 1-19 Granville Road & 100 Nathan Road, Tsim Sha Tsui, HK$ 112M
  • Jardine Engineering Corporation, Intern, Contract No. DE/2007/07 UV Disinfection Works for Shatin Sewage Treatment Works and Tai Po Sewage Treatment Works, 01/01/09, 07/01/09

Current Position

Project M&E Manager

Personal Information

  • Profession: Mechanical
  • Year of Birth: 1987
  • Nationality: Chinese

Timeline

Project M&E Manager

Gammon Construction Limited
01.2024 - Current

Project M&E Manager

Gammon Construction Limited
01.2021 - 01.2024

Senior Engineer (M&E)

Gammon Construction Limited
08.2018 - 12.2020

Senior Engineer (M&E)

Leighton Contractors (Asia) Limited
09.2016 - 08.2018

Assistant BS Engineer

Gammon E&M LIMITED (formerly known as Balfour Beatty E&M Limited)
07.2009 - 08.2016

Intern

Jardine Engineering Corporation
01.2009 - 07.2009

Bachelor Degree - Mechanical Engineering

Rowan Kwong Yeung CHUIProject M&E Manager