Summary
Overview
Work History
Education
Skills
Timeline
MICHAEL CHONG

MICHAEL CHONG

BIM Coordinator

Summary

I have extensive experience in creating detailed and accurate 3D models for a variety of architectural projects.

With a solid background in BIM modeling, I am committed to delivering high-quality project outcomes. I have substantial experience in developing detailed 3D models and working closely with architects and engineers. I am known for my reliable approach, adaptability to evolving project requirements, and proficiency with industry-standard BIM tools.

Overview

5
5
years of professional experience
17
17
years of post-secondary education
3
3
Languages

Work History

Architectural Assistant

The Oval Partnership Company
01.2017 - 04.2018
  • Drawing Production

Submission drawing, Shop drawing

  • Schedule Management

QTOs, Materials, Room Data

  • Documentation

Meeting Materials, Design Drawing

  • Field Measurements and Validations

Revit Dynamo& Grasshopper

Freelancer

Marco Wong Firm &Engineering Company
01.2017 - 01.2022
  • 綠在區區, One Bite Design. (SSP, NTK, KT)

Revit Draftsman, 3D Modelling Drawing generating

  • Wood art event, Very Hong Kong.org. (Wan Chai)

3D Modelling, Handbook, Installation method simulation

  • Rendering for Interior Design (Global)
  • Family/Generic Model Crafting (Global)

BIM Modeler

The Oval Parntership
08.2018 - 01.2022
  • Quantity take-offs and material estimates using BIM software, resulting in optimized resource allocation.
  • Elevated overall Model quality through rigorous quality control measures, identifying discrepancies in model information and coordinating revisions with relevant stakeholders.
  • Enhanced project efficiency by streamlining BIM processes and workflows to improve collaboration among team members.

BIM Modeler

Manly-tech Engineering Ltd.
08.2018 - 01.2022
  • Hong Kong International Airport Design and Build Contract for Automated Car Park A at Hong Kong Boundary Crossing Facilities (HKBCF) Phase 1


  • Hong Kong International Airport Contract C21W21– Automated Car Park B at Hong Kong-Zhuhai- Macao Bridge (HZMB) Hong Kong Port (Phase 1)


  • Hong Kong, Anderson Road Quarry (ARQ) 2-4, Hip Hing Construction Co., Ltd.


  • New Territories East Cultural Centre in Area 11, Fanling, Build King - ABLE Joint Venture


Education

Higher Diploma: Architecture Design

HONG KONG DESIGN INSTITUTE, TKL
04.2001 - 01.2018

Skills

Autodesk

Timeline

BIM Modeler - The Oval Parntership
08.2018 - 01.2022
BIM Modeler - Manly-tech Engineering Ltd.
08.2018 - 01.2022
Architectural Assistant - The Oval Partnership Company
01.2017 - 04.2018
Freelancer - Marco Wong Firm &Engineering Company
01.2017 - 01.2022
HONG KONG DESIGN INSTITUTE - , Higher Diploma: Architecture Design
04.2001 - 01.2018
MICHAEL CHONGBIM Coordinator