Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic
KENNETH CHING LING TSUI

KENNETH CHING LING TSUI

E&M ESTIMATOR

Summary

A self-motivated, details orientated Estimator with 2 years in dealing E&M tendering, with experience from pre-contract preliminary estimation stage in different parties (sub-contractor), look forward in gaining myself full spectrum of Estimation knowledge and ability to think from multiple perspectives and becoming a more well-rounded team-player. My goal is to pursue a challenging career opportunity with a progressive company where my experience will be further developed in contract administration and cost control.

Overview

31
31
years of professional experience

Work History

MEP ESTIMATOR

Southa Technical Ltd.
09.2021 - Current
  • Material quantity surveying; Cost Estimation; Analyzed and calculated field measurements, survey plans and plot plans to create proposals and process work orders. Preparing cost estimates. Conducted site visits and provided recommendations and informed advice regarding site viability. Analyzed designs and performed accurate cost analysis.

BS (Elect) ENGINEERING ASSISTANT

Southa Technical Ltd.
12.1996 - 09.2021
  • Support engineering projects by completing a variety of tasks, such as conducting inspections, preparing cost-benefit analyses, placing orders, verifying receipts, achieving target output, performing quality control checks, preventing product holds, and collaborating with managers and contractors.

ENGINEERING ASSISTANT

Newland Engineering Ltd.
05.1995 - 11.1996
  • Lead the front desk; processing visitors into the food plant, ensuring compliance with confidentiality and good manufacturing practices for all who entered facility. Issued visitor badges, answered telephones and responded to all requests by managers and supervisors for general workload assistance throughout the day. Reported to Engineering Manager.

Education

Yi Jin DIPLOMA - Construction management

HK college of technology
12.2023

HIGH SCHOOL DIPLOMA - undefined

TILTON SCHOOL
NH, USA
05.1998

No Degree - Building Service

The Hong Kong Institute of Vocational Education (IVE)
Morrison Hill, Hong Kong
04.2001 -

Skills

Versatile quantity surveying expertise

Professional 2D drafting in AutoCAD

MEP design using Revit

Project cost estimation

Additional Information

PROJECT & TENDER PORTFOLIO (Selected Works)

(Integrated from Tender Ref. 25‑2025)

Water Supplies Department (WSD) – Territory‑wide Water Infrastructure
  • Contract 2/WSD/25 (HK & Islands, NT East) – Mechanical & Electrical Works
    Value: HK$397.19M
    Large‑scale term contract covering water supply facilities across half of Hong Kong territory.
  • Contract 2/WSD/25 (Kowloon, NT West) – Mechanical & Electrical Works
    Value: HK$379.51M
    Twin contract for the remaining water infrastructure districts.

_________________________________________________________________________________________________________

Hospital & Healthcare Facilities
  • Kwai Chung Hospital Redevelopment (Phase 2)
    Value:
    HK$10.25B (Total Phase 2)
    Specialized MEP support and facility management for psychiatric care hospital redevelopment; includes MiMEP works and staged installation in live healthcare environment.
  • Kowloon Central Cluster – KCH Redevelopment (Phase 2)
    Value:
    HK$10.25B
    Full MEP and ELV works including smart lighting, building security, specialized mental‑health‑safe fixtures.
  • Queen Mary Hospital Redevelopment (Phase 1)
    Value:
    HK$7.1B
    HVAC, electrical, and medical gas systems including HEPA filtration, oxygen piping, and complex integration for Block K tower.
  • Cape Collinson Crematorium / Mortuary – Crematory Replacement
    Value:
    HK$32.79M
    Replacement of high‑temperature refractory and insulation systems.

_________________________________________________________________________________________________________

Public Housing & Community Facilities
  • HKHA District Maintenance (Tai Po / North)
    Value:
    HK$120M – HK$150M
    Electrical, lighting, and power distribution term maintenance for PRH estates.
  • Kwu Tung North Multi‑Welfare Services Complex
    Value:
    HK$1.8B
    MiMEP modular corridors (HVAC ducts, fire pipes, electrical trays); pioneer use of MiC/MiMEP; 1,750 residential care places.

_________________________________________________________________________________________________________

MEP Operations & Specialist Systems
  • On‑Site Chlorine Generation Plants (Contract 15/WSD/20)
    Value:
    HK$239.4M
    Specialist maintenance and operations for water treatment safety systems.

_________________________________________________________________________________________________________

Recent Project Awards (2024–2025)

  • Mechanical Plant and Equipment Installation (Contract 1079EM25T) (Awarded Aug 2025)

Description: A selective tender awarded by the Electrical and Mechanical Services Department (EMSD) for mechanical and electrical equipment works.

Timeline

MEP ESTIMATOR

Southa Technical Ltd.
09.2021 - Current

No Degree - Building Service

The Hong Kong Institute of Vocational Education (IVE)
04.2001 -

BS (Elect) ENGINEERING ASSISTANT

Southa Technical Ltd.
12.1996 - 09.2021

ENGINEERING ASSISTANT

Newland Engineering Ltd.
05.1995 - 11.1996

HIGH SCHOOL DIPLOMA - undefined

TILTON SCHOOL

Yi Jin DIPLOMA - Construction management

HK college of technology
KENNETH CHING LING TSUIE&M ESTIMATOR