Summary
Overview
Work History
Education
Skills
Nameinchinese
Educationbackground
Software
Timeline
Generic

Yuen Man Chiu

Unit 05, 3/F , Blk 2B Century Link, Tung Chung,HK

Summary

Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Establish the quality system and obtain the PCCS-AW Product certification for Aluminium Windows in current working place. Monitoring all related project which is under PCCS scheme.

Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance. Resourceful Project Management with over 10 years of expertise in organizing project operations, financial oversight and resource management to achieve smooth flow and project operations. Leads procurement of resources including fabricator and supplies. Monitors projects by adhering to project schedule and cost budget, managing production and project team, identifying problems and solve the issues.

Overview

14
14
years of professional experience
4
4
years of post-secondary education

Work History

Project Manager

Great Harvest Group
1 2016 - Current
  • Proposed Residential Development at Anderson Road Lot 1069 in SD3 kwun Tong, Kowloon;
  • Public Housing Development at Pak Tin Estate Phase 10;
  • Proposed Residential Development at TKOTL 70RP Phase 11, Lohas Park, Tseung Kwan O, N.T.
  • Residential Development at Site H and Estate Roads of Tseung Kwan O, N.TTKOTL 70 R.P.;
  • Construction of Subsidised Sale Flats Development at Tung Chung Area 54;
  • Proposed A&A works for Boarding Facilities & Ancillary Improvement Works at DGS and DGJS at No.1 Jordan Road, Kowloon, Hong Kong;
  • Proposed Comprehensive Development at oil Street, North Point, I.L 820, Hong Kong;
  • West Rail Tsuen Wan West Station TW5 Bayside Property Development Tsuen Wan Town Lot No.401

Project Coordinator

Josef Gartner & Co.(HK) Limited
06.2014 - 01.2016
  • New World Centre Remodeling Project & Remodeling of KIL 10978 for H3 (K11 Musea - Mixed Use Building)

Assistant Estimator

Lixil Corporation
05.2013 - 05.2014

Operation Assistant

Chevalier (Aluminium Engineering) Ltd
05.2010 - 05.2013

• Redevelopment at No.130 to 136 Johnston Road, Wan Chai (5/F sliding door and Tower – Studio)

(Curtain wall in stick system , window wall , Glass Balustrade , Alum.Cladding Cladding).

• New Building development at Rhodes Building F at Australia (Commercial building) (Curtain wall , Window wall, sunshade).

• Residential development of Macpherson indoor stadium, No.10 Yim Po Fong Street, Mong Kong (K.I.L. No.11050) (Tower and Podium)

(Curtain wall, Window wall, Glass cladding, Alum.Grille, Alum.Louver, Glass wall , Glass box, Swing door , Roof glass feature & Alum. Feature, Balustrade,Cladding , Glass canopy , Sliding door, Alum.Window & Stone Cladding)

• Residential development of Lo Wo Sha, Ma On Shan (Phase one – Garden Unit & Special Unit) (Sliding door & Window wall).

• Residential development, Road K.I.L.No.11146 (Tower and Podium Sliding Door) (Curtain wall , Alum.Cladding, Alu.m Grille, F.R.P.Window, Podium Sliding door, In- situ Window, Louvre, Precast window, Glass Cladding).

• Tseung Kwan O Area 56 Lot 72, N.T.(Podium and Duplex) (Curtain wall in stick system, Alum.Window, Window wall, Glass wall, Shop Front, Glass Box, Glass lift, Glass fin, Glass Canopy, Foot Bridge, Cover walkway, Alum.Louver, Glass Balustrade).

Education

Postgraduate Certificate in Building Engineering (QF6) -

The University of Hong Kong School of Professional
09.2023 - 03.2024

Master of Science - Msc in Sustainable Urban Development (QF6)

The Hong Kong Polytechnic University
09.2016 - 12.2018

Bachelor of Science - BSc (Hons) Construction Project Management

University of Central Lancashire
09.2014 - 12.2015

No Degree - Higher Diploma of Building Technology

HKCT
04.2001 -

Skills

Project Management

undefined

Nameinchinese

招婉雯

Educationbackground

  • Postgraduate Certificate in Building Engineering - The University of Hong Kong School of Professional and Continuing Education
  • Master of Science in Sustainable Urban Development - The Hong Kong Polytechnic University (2018)
  • Construction Project Management - University of Central Lancashire (2015)
  • Higher Diploma of Building Technology - Hong Kong College of Technology (2014)
  • Diploma of Accounting Computing - Caritas Bianchi College of Careers (2004)

Software

Microsoft - Word, Excel, PowerPoint, Project

Timeline

Postgraduate Certificate in Building Engineering (QF6) -

The University of Hong Kong School of Professional
09.2023 - 03.2024

Master of Science - Msc in Sustainable Urban Development (QF6)

The Hong Kong Polytechnic University
09.2016 - 12.2018

Bachelor of Science - BSc (Hons) Construction Project Management

University of Central Lancashire
09.2014 - 12.2015

Project Coordinator

Josef Gartner & Co.(HK) Limited
06.2014 - 01.2016

Assistant Estimator

Lixil Corporation
05.2013 - 05.2014

Operation Assistant

Chevalier (Aluminium Engineering) Ltd
05.2010 - 05.2013

No Degree - Higher Diploma of Building Technology

HKCT
04.2001 -

Project Manager

Great Harvest Group
1 2016 - Current
Yuen Man Chiu