Summary
Overview
Work History
Education
Skills
Work Availability
Timeline
Generic

Chen Ho Yeung

Senior Foreman
Rm 1715, Hok Sam Hse, Lung Hang Est, Shatin,HCW

Summary

Focused Foreman considered expert in planning, assigning and directing work tasks. Dedicated team player committed to maintaining safe, clean job sites. Pursuing role where hard work and dedication will be highly valued. Responsible Foreman with excellent project oversight, team management and blueprint interpretation skills coupled with more than 12 years of experience. Achieves project milestones and adheres to deadlines and quality standards.

Overview

18
18
years of professional experience
1
1
year of post-secondary education

Work History

Senior Foreman

China Geology (Hong Kong) Industry Ltd
Provision Of Village Sewerage In Sai Kung, DC/2019/09
10.2021 - Current
  • Sewerage Diversion .
  • Hand dig Tunnel .
  • Pipe Jacking .
  • Cut Slope.

Foreman

China Overseas (Hong Kong) Limited
, SSF Development At Kai Tak Site 2B6
10.2020 - 05.2021
  • Socketted H-Pile.
  • Bored-pile .

Senior Foreman

China Geology (Hong Kong) Industry Ltd
Retrofitting Of Noise Barriers On Tune Mun Road-Town Center Section , HY/2013/19
05.2016 - 04.2020
  • Mini Pile.
  • Pile Cap Works .
  • Road reservice .
  • Noise Barrier works .

Foreman

Tysan Management Limited
Office Development At 8-10 Wong Chuk Hang Road
02.2015 - 08.2015
  • Pipe Pile.
  • Socketted H-Pile.
  • Pile Cap Works .

Foreman

Hills Construction Limited
, MTR Contract SCL 1112 Hung Hom Station and Stabli
09.2014 - 12.2014
  • Box Culvert Diversion.
  • Sewerage DIversion.

Foreman

Sunnic Engineering Limited
(SSB507)Two 30-Classroom Primary School at Kai Ta, Property Development at TW Tsuen Sation
01.2014 - 09.2014
  • Socketted H-Pile.
  • Driving H-Pile.

Foreman Painter

Vibro (H.K.) Ltd
Residetial Development at Rural Building Lot No.836, 77 Peak Road The Peak
07.2013 - 01.2014
  • Mini Pile.
  • Pipe Pile.
  • Socketted H-Pile.
  • Pile Cap Works.

Senior Foreman

Paul Y. Construction Company, Limited
Shatin to Central Link (SCL) Contract No.1117 – Pat Heung Depot Modification Work
11.2012 - 05.2013
  • Bored-pile.
  • Reprovision of Noise Barrier.

Foreman

Leighton Contractors (Asia) Limited
H2547-South Island Line (East) Rail Project Contract 903
05.2011 - 09.2012
  • Foundation.
  • Drainage works.
  • Pile cap .
  • Pier.

Assistant Foreman

Vibro (H.K.) Ltd
J200939 – The Chinese University of Hong Kong
03.2010 - 02.2011
  • Foundation.
  • Slope protection works .
  • Drainage .

Assistant Surveyor

Leighton-China State-John Holland-JV
Macau, City of Dreams
05.2007 - 10.2009
  • Setting out of Gridlines and Benchmark.
  • Site control survey .
  • Game table setting out.
  • Survey check of Podium fitting out work.
  • Settlement and movement monitoring .
  • Topographical Surveying.

Surveyor

Shan Heng Construction Company (Macau) Ltd
Macau , TAP SEAC PLANO DE REQUALIFICAÇÃO DA ZONA DO TAP S
04.2006 - 02.2007
  • Prepare setting out data for retaining wall, road alignment, viaduct and pile cap.
  • Site control survey.
  • Topographical surveying.
  • Settlement and movement monitoring.
  • Prepare working drawing by CAD platform.

Assistant Surveyor

Yat Sum Setting Out Company (Macau) Ltd
Macau, Wynn Resort Macau
09.2005 - 03.2006
  • Setting out control survey.
  • Topographic survey on site.
  • Setting out of gridlines and benchmark.
  • Data processing.
  • Settlement monitoring.
  • Initial and As-built drawings.

CAD Operator

Auspat Concordance Surveys Macau Ltd
Macau, Wynn Resort Macau
01.2005 - 05.2005
  • CAD standards management.
  • Keeping record of site As-built drawings.
  • Keeping record of all surveying station and survey check.

Surveyor

Union Engineering & Trading Co., Ltd
04.2004 - 12.2004
  • Data processing.
  • Installation and measurement of extensometer.
  • Measurement of piezometer and inclinometer.
  • Settlement and Movement Monitoring.

Assistant Surveyor

Concordance Engineering & Surveying Service Company Ltd
Tsing Yi Terminal 9
04.2003 - 03.2004
  • Seawall monitoring.
  • Site formation monitoring.
  • Joint survey check for the setting out of the band drain.
  • Joint As-built survey for the seabed profile.

Assistant Surveyor

Target Survey Ltd
Tsing Yi Terminal 9
04.2001 - 03.2003
  • Seawall monitoring.
  • Site formation monitoring.
  • Joint survey check for the setting out of the band drain.
  • Joint As-built survey for the seabed profile.

Assistant Leveler

Necso Entrecanales Cubiertas
S.A. CC-602 Kam Tin Station
04.2000 - 01.2001
  • Setting out alignment and leveling .
  • Control survey.
  • As-build record survey.

Education

Form 4 To Form 5

Tsung Tsin Middle School
09.1997 - 06.1998

Construction Industry Training Authority Surveying

Construction Industry Training Authority
11.1999 - 03.2000

TCP T1 Certificate

IVE
03.2010 - 07.2010

Combined Certificate For Safety, Health & Environm

Occupational Safety & Health Council
02.2012 - 03.2012

Skills

Inroads SelectCAD

undefined

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Senior Foreman

China Geology (Hong Kong) Industry Ltd
10.2021 - Current

Foreman

China Overseas (Hong Kong) Limited
10.2020 - 05.2021

Senior Foreman

China Geology (Hong Kong) Industry Ltd
05.2016 - 04.2020

Foreman

Tysan Management Limited
02.2015 - 08.2015

Foreman

Hills Construction Limited
09.2014 - 12.2014

Foreman

Sunnic Engineering Limited
01.2014 - 09.2014

Foreman Painter

Vibro (H.K.) Ltd
07.2013 - 01.2014

Senior Foreman

Paul Y. Construction Company, Limited
11.2012 - 05.2013

Combined Certificate For Safety, Health & Environm

Occupational Safety & Health Council
02.2012 - 03.2012

Foreman

Leighton Contractors (Asia) Limited
05.2011 - 09.2012

Assistant Foreman

Vibro (H.K.) Ltd
03.2010 - 02.2011

TCP T1 Certificate

IVE
03.2010 - 07.2010

Assistant Surveyor

Leighton-China State-John Holland-JV
05.2007 - 10.2009

Surveyor

Shan Heng Construction Company (Macau) Ltd
04.2006 - 02.2007

Assistant Surveyor

Yat Sum Setting Out Company (Macau) Ltd
09.2005 - 03.2006

CAD Operator

Auspat Concordance Surveys Macau Ltd
01.2005 - 05.2005

Surveyor

Union Engineering & Trading Co., Ltd
04.2004 - 12.2004

Assistant Surveyor

Concordance Engineering & Surveying Service Company Ltd
04.2003 - 03.2004

Assistant Surveyor

Target Survey Ltd
04.2001 - 03.2003

Assistant Leveler

Necso Entrecanales Cubiertas
04.2000 - 01.2001

Construction Industry Training Authority Surveying

Construction Industry Training Authority
11.1999 - 03.2000

Form 4 To Form 5

Tsung Tsin Middle School
09.1997 - 06.1998
Chen Ho YeungSenior Foreman